OrdenTip

Work orders for installation and maintenance

Manage installation and field maintenance orders in OrdenTip. Office and field staff can check the agreed scope, outstanding parts and what each visit still needs before closure.

Before leaving

Record the job site, who can provide access, the agreed time window and the assigned technician. Attach the photos or measurements needed to prepare the materials.

On site

Compare the quoted scope with what you find. If the installation needs extra cable trunking, document the difference and send a quote amendment before adding it to the job.

At the end of the visit

Record the checks performed, materials used and any outstanding work. If another visit is needed, note which part or decision will allow you to schedule it.

Tracking a two-visit installation on one order

Before assignment
The office enters two network points, a sketch, an access contact and the quoted supplies. It assigns the work to the installer visiting the shop. A colleague covering the shift can look up what the customer agreed.
After the site visit
The installer records the first point as tested and notes that the second needs trunking. The office prepares the purchase and records the supplier’s deliveries. After a partial delivery, staff can see what is missing before confirming the return visit.
On completion
The returning technician checks the sketch and outstanding task, records the second outlet test and asks the office to check the balance. The customer keeps the tracking link from the first visit.

What does the technician need to quote an installation?

For a shop with two network outlets, record the room for each outlet, the intended cable route and who can authorize drilling. Attach a sketch with verified dimensions. Itemize materials, travel and installation hours so the customer can see what the visit covers.

How do I resume an unfinished visit?

After the first visit, record what was tested and what remains. For example, “Reception outlet working. Stockroom outlet waiting for trunking.” Specify the material and assign a team member. Before returning, check that the part arrived and confirm who can open the stockroom.

Guides for this industry

Set up your first job

Create an order for your next site visit and keep the sketch, agreed materials and access details together.