What to take to a network installation visit
Plan the cable route, supplies and handover tests for installing network outlets in a shop. Use the visit sheet to spot gaps before sending the crew.

Confirm who can open the site
Record the address, area, contact and access window. For a visit before opening time, confirm who will have the key.
Sketch the route
Ask for measurements and photos of the start and end points. Mark any sections that still need measuring on site.
Prepare the dispatch list
Separate quoted materials, tools and consumables. List quantities and check availability before assigning the visit.
Agree on how to handle scope changes
If the site measurement adds eight metres, record the difference and get the extra work approved. Identify who can authorize changes during the visit.
Finish with a functional check
Test the installed outlets with the site contact. Record the results, observations and next action for any unfinished section.
Packing and handover sheet for two network outlets
- Route and access
- Mark the counter and stockroom on the sketch. List measured length, changes in level and the access contact for each leg. A distance estimated from a photo still needs measuring on site.
- Supplies per outlet
- Group cable, trunking, terminations, labels and consumables by location. Note what is already on site to avoid packing it twice. Reserve matching identification labels for the two ends of each run.
- Agreed test
- For a wire map check, bring the tester and compatible remote adapter. Match the result to the outlet label. If the customer needs performance certification, agree on the test and the equipment required for it.
Technical reference Reading a wire map with MicroScanner² (Fluke Networks)
Sample job sheet for the installer
For a network run from the entry box to a counter, the order might read “18-metre measured route, two outlets, white trunking. Enter through stockroom between 8 and 9. Confirm partition crossing with manager.” Attach the sketch and mark which lengths were measured remotely. The installer can verify those before cutting material.
How do I quote extra metres found during the visit?
If the final measurement is 24 metres rather than the agreed 18, document the extra six. Specify additional supplies and any change in labor. Send an amendment with the revised schedule and record the customer’s decision before doing that section. Keep the final measurement for future maintenance.
Use this example in OrdenTip
Keep the sketch with the installation order. If the actual route changes, share the extra cost with the customer before using more material.