A corrective maintenance report should tell the next technician which part to bring and what to test. Follow an extractor fan from its first inspection to handover.

  1. Identify the equipment serviced

    Record its precise location, model and internal reference. In a building with several identical units, specify the floor and area so the technician returns to the right one.

  2. Summarize the confirmed diagnosis

    Describe the symptom, the test and the result. Distinguish confirmed findings from hypotheses that require another visit.

  3. Specify what is blocking completion

    Record the part reference or outstanding authorization and assign someone to obtain it. A waiting stage is more informative when the team knows who can move it forward.

  4. Agree on downtime with the equipment user

    Ask when the equipment can be taken out of service and when it must be back in operation. For a kitchen extractor, the keyholder may be available for longer than the window before lunch preparation starts.

  5. Check conditions before rescheduling

    Verify the part arrived and matches the reference, and confirm the customer can provide access. Then agree on the return window.

  6. Brief the technician taking over

    Before departure, ask the incoming technician to locate the asset, reserved part and pending test in the report. Pair a close-up photo with a wider view so they can find the unit on arrival.

  7. Compare before and after

    Repeat the test that previously failed and record the result in the same order. This documents why the job could be closed.

A handover record the next technician can use

Asset and symptom
Identify the fan by its asset tag and location. If there are two identical units, include a wide shot showing the surroundings. Record when the vibration starts during startup.
Part and owner
List the part reference, quantity outstanding and who checks the delivery. Distinguish between a part on order and one checked and reserved for this asset before promising a time slot.
Closure check
Agree with the site contact on the conditions for repeating the test. On return, record the part used, the observed result and who accepted the work. If the vibration persists, specify the next diagnostic task.

Technical reference Planning and tracking maintenance work orders (IBM)

Sample report for a follow-up visit

The first technician might write “Kitchen extractor, ground floor. Vibrates at startup. Play confirmed in mounting bracket. Awaiting bracket matching recorded reference. Manager can provide access before 10.” Attach a photo of the mounting. The next technician can prepare without repeating the entire inspection.

When should I confirm the return date?

If two parts were ordered and only one arrived, check which part and quantity this equipment requires and what actually came in. Confirm availability, site access and downtime before offering an appointment. At completion, note the part used and whether the extractor vibrated when you repeated the startup test.

Use this example in OrdenTip

Use the maintenance order to record the diagnosis, check what arrived from the supplier and hand the history to the technician making the return visit.